Car Platform
العربية

Component guide

Car platform components

One visual language for the customer site, the customer app, the inspector app and the internal operating system — Arabic first, lively, built on real components.

01

Foundations

The colours, type, shapes, shadows and motion every screen is built from.

Colour

SACA’s navy and sky, plus an electric cyan for live states and amber for highlights

Navy — brand, headings, primary buttons

navy-975

navy-950

navy-900

navy-800

navy-700

navy-600

Sky — links, selection, focus

sky-700

sky-600

sky-500

sky-400

sky-300

sky-200

sky-100

sky-50

Accents of life

volt-500

volt-400

volt-100

amber-500

amber-400

amber-100

Status colours

success

success-soft

warning

warning-soft

danger

danger-soft

info

info-soft

Neutrals

ink

ink-soft

muted

subtle

line-strong

line

canvas

surface

Gradients

Aurora — page heads and dark panels
Brand stroke — the one hero action
Sky — the welcome band

Type

Alexandria for headings and big numbers, IBM Plex Sans Arabic for text

Toyota Camry 2024 — 200-point inspection

Page title

Section title

Body text that tells the customer their next step plainly, always in Latin digits: SAR 87,500.

Secondary text — updated 5 minutes ago

Price

87,500

Shape and elevation

Generous rounded corners and light, layered navy shadows

card
raised
lift
overlay
glow
glow-volt

Motion

Quick and soft; honours «reduce motion»

Lane line — progress and tracking

Sheen — the hero action
Pulse — a live state
Float — a featured item
02

Buttons, badges and cards

How people press, and how a state reads at a glance.

Buttons

They press down on click and lift on hover; the brand button shines — use it for one action per screen

Sizes

States

On a dark surface

Icon buttons

Badges

Short tags: kind, feature, count

InspectedJust arrivedFinancingPrice dropFeatured1-year warranty
FeaturedInspectedPrice dropJust arrived824

Status chips

A record’s state with a dot; the pulse is for the single live state

ApprovedAwaiting inspectionInspecting nowOn the wayRejectedDelivery failedDraftSold

Avatars

+3

Tooltips

Keyboard shortcuts

⌘Kfor quick search

Toasts

They stack, expand on hover and swipe away

Cards

Always a header and a body; six kinds

Order 1042

Default

The card’s content sits here with comfortable spacing.

Order 1042

Raised

The card’s content sits here with comfortable spacing.

Order 1042

Interactive — hover it

The card’s content sits here with comfortable spacing.

Order 1042

Dark

The card’s content sits here with comfortable spacing.

Order 1042

Muted

The card’s content sits here with comfortable spacing.

Order 1042

Glass

The card’s content sits here with comfortable spacing.

03

Forms and input

Search and filters, sign-in by mobile number and code, photo upload.

Field and label

Label, required star or “optional”, a hint, and one message under the field — an error shakes in

As on your national ID

Write your full name as on your ID

The name matches the ID

Label in a start column — for settings pages

Text inputs

Three sizes, start and end icons, a unit glued to the value, a clear button, and an ltr field moves its slots too

Sizes

Variants

SAR

The market price for one like it is 128,000–142,000 SAR

km

As shown on the odometer

Always written left to right

KSA

Write a valid email like name@mail.com

Long text

Grows as you type and counts characters — amber at 90%, red at the limit

Write a short description of the car

Mobile number

Fixed +966, formats as you type, always left-to-right, Arabic-Indic digits folded

+966

We will text the verification code to it

+966
+966

A Saudi mobile number starts with 5

+966

Verification code

Animated caret, paste the whole code, shakes when wrong, green on success

Four boxes

Six boxes

4
8

Wrong code

7
3
1
0

That code is not right — check the message and try again

Verified

2
0
2
6

Verified

Countdown, then the link

Resend in 00:12

Select

An icon and a description per option, grouped with headings, a check on the chosen one

Choose the city

Make and model search

Matches Arabic and English at once — try “camry”, “patrol” or type it in Arabic

Multi select

Chips removed in one tap; the list stays open while you pick

ToyotaLexus

Checkboxes

The tick draws itself; “select all” turns partial when only some are picked

2,400 SAR
Small

Single choice

A list with a dot that springs in

Switches

The thumb goes to the inline end when on — right in English, left in Arabic

Choice cards

The ring glides from card to card

Sliders

The value bubble rises while dragging; market bars behind the price range

80,000 – 220,000 SAR · 3,297 cars

Up to 120,000 km

Segmented control

The white pill slides; scrolls sideways on phones

On a dark surface

Number stepper

The number rolls; press and hold repeats

Seats

2 to 9 — press and hold to repeat

7

Keys

Keys handed over with the car

2

Previous owners

As in the traffic record

1

Choice chips

For search filters: body type, fuel, transmission, colour

Body type

Fuel

Transmission

Exterior colour · 2

File drop zone · Uploaded files

Glows while files hover over it; the formats line comes from accept — drop real files here

Drag and drop files hereor

PDF, JPG or PNG — up to ⁦10 MB⁩ each

Compact

Drag the car photos hereor

Images — up to ⁦10 MB⁩ each

In error

Drag and drop files hereor

PDF — up to ⁦5 MB⁩ each

Drop a file in the zone above to watch it upload here

  • pdf

    istimara-land-cruiser-2022.pdf

    1.4 MB

    Uploaded

  • jpg

    front-view.jpg

    3.1 MB

    Uploading… ⁦62%⁩

  • pdf

    service-history.pdf

    840 KB

    Scanning the file· Checking the file is safe

  • heic

    odometer.heic

    11.8 MB

    Rejected· Larger than the allowed size

Photo slots

One slot per angle; the inspector uses it for mandatory photos — press an empty slot to pick a photo

1 of 5 mandatory photos added

FrontFront
Rear46%Rear
SidePhoto rejectedSide

Book an inspection

Day, then time; booked slots are hatched and disabled

Inspection in Al Malqa — Riyadh

Choose a day

Choose a time9 slots open

Your slotThu 22 Oct · 10:30 AM

Sign in with a mobile number

Number, then code, with an animated step change — for the demo the code is 2026

Welcome

Sign in with your mobile — no password

+966

By continuing you accept the terms and the privacy policy

Sell your car — quick form

Press “Send request” empty: a message under every field and focus on the first bad one

Sell your car within 24 hours

Fill in the basics; we send an initial offer and book the inspection

km

As shown on the odometer

SAR

The market price for one like it is 128,000–142,000 SAR

0 / 3

Drag the car photos hereor

Images — up to ⁦10 MB⁩ each

At least three photos: front, rear and side

Your data is safe and nothing is listed before you approve

04

Overlays and navigation

Dialogs, side and bottom sheets, menus, tabs and the command palette.

Which overlay do I use?

Pick by the task, not by the look

  • Dialog

    A short, focused task that must finish before going back — edit a price, add a note.

  • Confirm dialog

    An irreversible or accountable step — reject a price, record “inspection failed”, cancel an order.

  • Drawer

    Read or work on one record without leaving the list — a car quick view, an opportunity file.

  • Bottom sheet

    On phones: filters, sort, a quick pick — within thumb reach.

  • Popover

    A small interactive extra beside its trigger — a price breakdown, how a number is computed.

  • Hover card

    A preview on hover only — the same facts are one click away on the link.

  • Dropdown menu

    A list of actions on a record or a row — “More”.

  • Command palette

    Search everything and act from the keyboard — in the back-office header.

Dialog

For a short focused task. Springs in over a blurred navy backdrop; on phones it floats near the bottom edge

Sizes

Controlled from code — open + onOpenChange from a client component

Confirm dialog

For a step with no way back. A required reason refuses to continue until written — try confirming empty

onConfirm returns a promise: the button spins until it settles

Drawer

Slides in from the inline end (the right in English). Read or work on a record without leaving the list

Drawer sizes

Bottom sheet

For phones: follows the finger, pull down to close. With snap points it opens half way and pulls up to full

Try it at phone width to drag it with a finger

Popover

With an arrow; opens on click, closes on Esc or a click outside. No table can clip it

Hover card

Appears when the pointer rests on a stock number. Preview only — everything in it is one click away

Noura Alqahtani reserved car STK-23988 and car STK-24052 moved to preparation.

Dropdown menu

Icons, a description line, shortcuts, toggles, one-of-many, a submenu, and a danger item last. The highlight glides between rows

Context menu

Right-click a row (or long-press on touch). A shortcut for power users — every action in it is also on the row’s “More” button

Stock no.CarPriceStatus
STK-24117Toyota Land Cruiser GXR319,500 SARAvailable
STK-23988Hyundai Sonata89,000 SARReserved
STK-24052Lexus ES 350164,500 SARInspecting
STK-23871Nissan Patrol Platinum278,000 SARAvailable

Right-click any row

Tabs

Underline: a bright bar slides to the chosen tab — for page sections

Toyota Land Cruiser GXR 2024, 18,400 km, inspected and graded 94 of 100, for sale in cash or with financing.

Pill tabs

A raised pill glides — for a compact filter inside a card

248 purchase requests from individuals and dealers.

Accordion

FAQs: the answer opens to its real height and the plus folds into a minus

A certified inspector checks more than 150 points — body, engine, gearbox, electrics and a road test — with mandatory photos for each. The full report and the final grade appear on the car page.

Yes. Choose “Financing” at checkout and send your details once; offers from partner lenders arrive for you to pick, and the car is held for you while the request is reviewed.

Enter the car’s details and book an inspection. After it we suggest a price; once you agree we list the car and handle viewings, negotiation and handover, then pay you the amount less the commission.

You have three days to request a return if there is a defect the inspection report did not mention. Open the return from your account; refunds go back the same way you paid.

Flush — inside a card, several open at once

Frequently asked questions

A certified inspector checks more than 150 points — body, engine, gearbox, electrics and a road test — with mandatory photos for each. The full report and the final grade appear on the car page.

Yes. Choose “Financing” at checkout and send your details once; offers from partner lenders arrive for you to pick, and the car is held for you while the request is reviewed.

Enter the car’s details and book an inspection. After it we suggest a price; once you agree we list the car and handle viewings, negotiation and handover, then pay you the amount less the commission.

You have three days to request a return if there is a defect the inspection report did not mention. Open the return from your account; refunds go back the same way you paid.

Pagination

The navy tile glides to the new page. On phones: “3 of 25”

Few pages

No results

Load more

The compact alternative to numbers, under a grid of car cards

  • Toyota Land Cruiser GXR

    319,500 SAR

    Available
  • Hyundai Sonata

    89,000 SAR

    Reserved
  • Lexus ES 350

    164,500 SAR

    Inspecting
  • Nissan Patrol Platinum

    278,000 SAR

    Available

Showing 4 of 12

Command palette

Press ⌘K or Ctrl+K anywhere. Matches Arabic and English: try “land”, “لاندكروزر”, “نوره”, “58214”

05

Data and states

Tables, filtering, steps and timelines — plus the empty, loading and error states.

Data table

Sort by the headers, select rows to raise the action bar, change columns and density from “View”

Table state

Purchase requests5

  • City:Riyadh
Purchase requests
Toyota Land CruiserPR-24081 · GXR · 2022Offer sent
Lexus ES 350PR-24079 · Platinum · 2023Accepted
Kia K5PR-24077 · GT-Line · 2022Awaiting inspection
Chevrolet TahoePR-24073 · LT · 2021Offer sent
Nissan AltimaPR-24070 · SV · 2020Rejected

From a server page: row links and compact density

Rows are built on the server with tableRows; the less important columns hide on phones

Latest requests5

Latest requests
CarStatus
Toyota Land CruiserPR-24081 · GXR · 2022Offer sent
Hyundai SonataPR-24080 · Smart · 2021Pricing
Lexus ES 350PR-24079 · Platinum · 2023Accepted
Nissan PatrolPR-24078 · LE Platinum · 2020Inspecting
Kia K5PR-24077 · GT-Line · 2022Awaiting inspection

Key–value list — Car details

A grid of tiles or rows, with icons and copyable values

VIN
JTMHV05J804128377
Plate
ABJ 4281
Owner
Khalid Alotaibi
Mileage
48,200 km
Colour
Pearl white
Fuel
Petrol — 4.0 L
Location
Riyadh — Al Malqa, Anas Bin Malik Rd
IBAN
SA03 8000 0000 6080 1016 7519

Key–value list — Price offer summary

Suggested price
268,500SAR
Inspection fee
FreeWaived when the offer is accepted
Platform commission
4,028SAR
Valid until
2026-10-22
Net due to the seller
264,473SAR
Request
PR-24081

Contact and activity log

Calls, WhatsApp, SMS, notes and status changes — on one line

  1. WhatsApp

    Hello Mr. Khalid, we sent the price offer to your request link. It is valid for 48 hours.
    Noura Alqahtani· Purchasing agent
  2. Status change

    PricingtoOffer sent
    Noura Alqahtani· Purchasing agent
  3. CallDuration 4:18

    The customer understands the suggested price and wants until the evening to think.
    Noura Alqahtani· Purchasing agent
  4. Note

    Light scratch on the rear bumper — SAR 1,500 taken off the suggested price.
    Noura Alqahtani· Purchasing agent
  5. Inspection done — 92 of 100

    148 of 152 points passed. The full report is attached to the request.
    Eng. Fahad Aldosari· Inspector
  6. Missed call

    Noura Alqahtani· Purchasing agent
  7. SMS

    Your car inspection is tomorrow 10:30 AM in Al Malqa. To reschedule: cars.sa/r/24081
  8. Request received from the website

Steps

Horizontal and vertical; the line fills as you advance, done steps are clickable

Horizontal

  1. 4Price offer
  2. 5Handover & payment

Vertical — with an error step

  1. Assigned to inspectorEng. Fahad Aldosari — 09:12
  2. Inspector on the wayArrived 10:05
  3. Mandatory photosCould not inspect: the customer did not answer
  4. 4Inspection points152 points in 9 zones
  5. 5Send the reportTo the chief inspector for approval

Alerts

Soft, accent bar, with actions, and dismissible with an exit animation

Soft

Inspection is free this week

Every new purchase request is inspected at no fee until the end of the week.

Price offer sent

The customer got it on WhatsApp and SMS.

The SLA is about to run out

38 minutes left to price PR-24080 before it escalates to the supervisor.

Commission policy update

The new commission on listed cars starts on 1 November.

Accent bar and icon tile

Inspection is free this week

Every new purchase request is inspected at no fee until the end of the week.

Price offer sent

The customer got it on WhatsApp and SMS.

The SLA is about to run out

38 minutes left to price PR-24080 before it escalates to the supervisor.

Commission policy update

The new commission on listed cars starts on 1 November.

Page announcements

A full-width band above the content — one announcement at a time

Free inspection until the end of the month

Book an inspection at your place within 24 hours.

Scheduled maintenance tonight

Auctions may pause from 2:00 to 3:00 AM.

Your account is awaiting verification

Verify your identity to receive the payment.

Can’t reach the e-invoicing platform

Invoices are kept and will be sent automatically once it is back.

Your car is sold!

The amount reaches your account within two working days.

Every state

Empty · loading · success · error · rejection — for every flow in the product

Empty state

No cars in stock

Add the first car or import a dealer’s list to start publishing.

No results for “Land Cruiser 2026”

Try another year or remove some filters.

Late tasks

No late tasks

Every task is within its SLA.

Loading

Working out the suggested price…

Comparing 1,240 similar deals in the market

Loading…

Saving changes

Loading over the content

Suggested price

268,500 SAR

Seller profile complete64%

Success

Inspection booked

The inspector arrives Tuesday at 10:30 AM. We sent the details by SMS.

Congratulations! Your car is sold

The amount arrives within two working days.

Error

The first retry fails, the second succeeds

We couldn’t load the requests

Rejection message to a customer

We can’t buy your car this time

Thank you for your trust, Khalid. We reviewed the inspection report carefully and can’t make an offer for this car.

Why

The car did not pass the structural inspection

There are signs of repair on the front chassis rail, which is outside our buying criteria.

What happens next

  1. 1

    Read the full inspection report

    It stays free on the request link for 30 days.

  2. 2

    List your car on commission

    We publish it with the report, and the buyer decides after reading it.

  3. 3

    Ask for a re-inspection after the repair

    At no extra fee within 60 days.

Request no. PR-24076

Your financing request isn’t complete yet

It is saved — one document is missing before we send it to the financier.

What is missing

We need a recent salary certificate

The uploaded one is older than 3 months.

What happens next

  1. 1

    Upload a salary certificate from the last 30 days

  2. 2

    We review it within two hours and text you

Request no. FN-88213

Skeletons

Block, line and circle, plus ready presets: card, table rows, car card

Primitives

Record card

Car card

Table rows

Progress

A bar that springs to its value, moving stripes when indeterminate, and a ring with a tweening value

Uploading inspection photos7 of 12 photos

Mandatory photos: 4 angles, the odometer, the VIN

Seller profile complete64%
Uploading the video42%
Preparing the report…

Tones and sizes

92%Inspection score58%Uploading inspection photos64%Profile42mSLA41%
06

Indicators and charts

Instrument panels: live numbers, gauges and the sales funnel.

Instrument panel

Numbers tween when they change — press «Refresh numbers»

Sales today

14cars
Up, Better+16.7%vs yesterday

Cars in stock

1,284cars
Down, Worse−3.2%vs last week

Inspections today

46
Up, Better+9.5%vs yesterday

SLA compliance

93.4%
Up, Better+1.8%Target ⁦95%⁩

Stat tile: variants and states

Light, dark, compact, loading, flat, and when going up is bad

Revenue this month

18.6MSAR
Up, Better+12.4%vs previous period

Stale cars

181cars
Up, Worse+8.2%Over 90 days — up is bad here

Average days to sell

23days
Down, Better−6.1%vs previous period

Rejected listings

7
No change0%vs previous period

Unsent invoices

3
Down, Better−40%vs previous period

Sales today

14cars
Up, Better+16.7%vs previous period

Cars in stock

Down, Worse−3.2%vs previous period

Sparklines

A fading wash and a pulsing dot on the latest reading

Monthly sales

Time runs left to right in both languages; hover a column

0100200300400500JanFebMarAprMayJunJulAugSepOctNov402Dec

Average inspection score by model

The highlighted column is the story; the rest step back

020406080100Toyota LandCruiserHyundaiSonata94Lexus ESNissanPatrolKia K5ChevroletTahoe

Stale cars by days in stock

Horizontal bars for long labels

  • Under 30 days514cars
  • 31–60 days382cars
  • 61–90 days207cars
  • 91–120 days118cars
  • Over 120 days63cars

Bought, sold and listed on commission

Hover or use the arrow keys; click a legend item to hide it

0100200300400500JanFebMarAprMayJunJulAugSepOctNovDec

Weekly sales revenue

Area chart — cash vs financed

02M4M6M8M10M07-2708-1008-2409-0709-2110-12

Stock by state

Hover a segment or a legend row

1,284

cars in stock

  • Ready for sale642⁦50%⁩
  • In preparation238⁦18.5%⁩
  • Awaiting inspection156⁦12.1%⁩
  • Reserved121⁦9.4%⁩
  • Listed on commission94⁦7.3%⁩
  • Return requested33⁦2.6%⁩

Inspections by city

1,274

inspections

  • Riyadh486⁦38.1%⁩
  • Jeddah341⁦26.8%⁩
  • Dammam212⁦16.6%⁩
  • Makkah138⁦10.8%⁩
  • Madinah97⁦7.6%⁩

Sales funnel

Conversion between every two stages, and how many dropped

  1. Leads
    4,820
    ⁦100%⁩
  2. ⁦70.7%⁩

    Contacted
    3,410
    ⁦71%⁩
  3. ⁦37.1%⁩

    Test drive / visit
    ⁦26%⁩1,265
  4. ⁦50.8%⁩

    Financing
    ⁦13%⁩642
  5. ⁦60.4%⁩

    Sold
    ⁦8%⁩388

Overall conversion⁦8%⁩from Leads to Sold

Speedometer

The needle swings on a spring and settles; zones are painted on the rim

020406080100

87pts

Good

Land Cruiser 2023 inspection score

⁦0%⁩⁦20%⁩⁦40%⁩⁦60%⁩⁦80%⁩⁦100%⁩

93.4%

Fair

Task SLA compliance

5

Fair

Inspector load today

Progress to target

A flag at the target, a thin tick for where you should be by today

October sales

312cars/ 400 cars

Behind pace
Target 400 carsTo go 88 cars

October revenue

18.6MSAR/ 24M SAR

On pace
Target 24M SARTo go 5.4M SAR

Cars listed this month

1,046cars/ 1,000 cars

Target reached
Target 1,000 carsExceeded by 46 cars

Inspector capacity by day and slot

Booked out of capacity; hatched is closed. One tab stop — use the arrow keys

08:0010:0012:0014:0016:0018:0020:00
Sun
2
4
3
1
3
5
1
Mon
1
3
4
2
4
6
2
Tue
1
2
3
3
4
4
0
Wed
3
5
6
2
3
5
2
Thu
4
6
4
2
5
6
6
Fri
—
—
—
1
3
5
3
Sat
2
2
3
1
2
4
1
LowFullClosed

Chart legend

Static, or interactive to show and hide series

  • Ready for sale642
  • In preparation238
  • Awaiting inspection156
  • Reserved121

No data

The chart keeps its height so the page does not jump

No data for this period

Change the period or the filters to see numbers here

07

Car components

The car card and its photo gallery, the plate, price and financing, specs, comparison and payment methods.

Car card — grid

Swipe the photos, hover for arrows, tap the heart, and pick «Compare» to raise the tray

+18All photos
Inspected94
2424 photos
Price drop

Toyota Land Cruiser

GXR Twin Turbo · 2023

Financing
Year
2023
Mileage
38,400 km
Fuel
Petrol
Transmission
Automatic

Al Malqa, Riyadh

289,000SAR

or from 4,890 SAR/month

+12All photos
Inspected88
1818 photos
Just arrived

Hyundai Sonata

Smart · 2022

Financing
Year
2022
Mileage
61,200 km
Fuel
Petrol
Transmission
Automatic

Al Rawdah, Jeddah

89,500SAR

or from 1,590 SAR/month

+25All photos
Inspected97
3131 photos
Just arrived

Lexus ES

300h Platinum · 2024

Financing
Year
2024
Mileage
12,800 km
Fuel
Hybrid
Transmission
Automatic

Al Shati, Dammam

219,000SAR

or from 3,720 SAR/month

+16All photos
Inspected90
2222 photos
Price drop

Nissan Patrol

LE Platinum · 2021

Financing
Year
2021
Mileage
74,500 km
Fuel
Petrol
Transmission
Automatic

Al Narjis, Riyadh

238,000SAR

or from 4,040 SAR/month

+8All photos
1414 photos

Toyota Hilux

Double cab · 2023

Financing
Year
2023
Mileage
45,900 km
Fuel
Diesel
Transmission
Manual

Al Salamah, Jeddah

112,000SAR

or from 1,990 SAR/month

+14All photos
Inspected92
2020 photos
Price drop

Toyota Camry

GLE Hybrid · 2023

Financing
Year
2023
Mileage
29,300 km
Fuel
Hybrid
Transmission
Automatic

Al Faisaliyah, Dammam

118,500SAR

or from 2,110 SAR/month

Spec comparison

Best in each row in green; follows what you pick on the cards above

Spec comparison

Spec

Toyota Land Cruiser

GXR Twin Turbo

Hyundai Sonata

Smart

Lexus ES

300h Platinum

Price
289,000 SAR
89,500 SARBest
219,000 SAR
Year
2023
2022
2024Best
Mileage
38,400 km
61,200 km
12,800 kmBest
Inspection score
94/100
88/100
97/100Best
Power
409 hpBest
191 hp
215 hp
Fuel economy
8.9 km/L
14.2 km/L
19.6 km/LBest
Seats
7 seatsBest
5 seats
5 seats
Fuel
Petrol
Petrol
Hybrid
Transmission
Automatic
Automatic
Automatic
Drivetrain
Four-wheel drive
Front-wheel drive
Front-wheel drive
Engine
3.5 L V6
2.5 L I4
2.5 L hybrid
Exterior
Pearl white
Fiery red
Metallic grey

Compare tray

Rises from the bottom when a car is picked; framed here for the demo

Car card — horizontal

For search results; stacks vertically on a phone

+16All photos
Inspected90
2222 photos
Price drop

Nissan Patrol

LE Platinum · 2021

Financing
Year
2021
Mileage
74,500 km
Fuel
Petrol
Transmission
Automatic

Al Narjis, Riyadh

238,000SAR252,000Save 14,000

or from 4,040 SAR/month

+14All photos
Inspected92
2020 photos
Price drop

Toyota Camry

GLE Hybrid · 2023

Financing
Year
2023
Mileage
29,300 km
Fuel
Hybrid
Transmission
Automatic

Al Faisaliyah, Dammam

118,500SAR124,000Save 5,500

or from 2,110 SAR/month

Compact card

For «similar cars» rails and side lists

97

Lexus ES

202412,800 km

219,000SAR
88

Hyundai Sonata

202261,200 km

89,500SAR

Toyota Hilux

202345,900 km

112,000SAR

Loading state

Same footprint as the card, with a moving sheen

Price tag

Cash price in the display face, old price struck with the saving, and the monthly instalment

Cash price
289,000SAR305,000Save 16,000

or from 4,890 SAR/month

VAT included

219,000SAR

or from 3,720 SAR/month

118,500SAR124,000Save 5,500
89,500SAR

or from 1,590 SAR/month

Excluding VAT

On a dark surface

238,000SAR252,000Save 14,000

or from 4,040 SAR/month

Saudi licence plate

Drawn as it is in the street; it does not mirror with the page

Specs

Icon tiles, the car’s real colour

Year
2023
Mileage
38,400 km
Fuel
Petrol
Transmission
Automatic
Engine
3.5 L V6409 hp
Drivetrain
Four-wheel drive
Exterior
Pearl white
Interior
Beige leather
Seats
7 seats

Empty comparison

Add at least two cars to compare

Financing calculator

Move the down payment and change the term — the instalment rolls to its value

Work out your monthly payment

SAR
Down payment57,800 SAR⁦20%⁩
Minimum ⁦10%⁩⁦50%⁩
Term
Annual profit rate⁦3.49%⁩

Monthly payment

4,526SAR/month

60 months · ⁦3.49%⁩

DownFinancedProfit

Breakdown

Down payment
57,800 SAR
Financed amount
231,200 SAR
Total profit
40,344 SAR
Total payable
329,344 SAR

An estimate, subject to the lender’s approval and credit assessment

Payment methods

Sample only: the brief does not name the four methods, so they come in as data

Price offer page

The page the seller opens from an SMS; try accept, reject and counter

Price offerOffer PO-30518

Hello Khalid Alotaibi, here is our offer for your car

Toyota Land Cruiser

GXR Twin Turbo · 2023

Offered price

271,500SAR

Your asking price: 285,00013,500 below your ask

Time left

Valid until 21 October 2026 at 17:00

--hours
:
--min
:
--sec

Need help? Call us

Offer states

Price offerOffer PO-30518

Hello Khalid Alotaibi, here is our offer for your car

Toyota Land Cruiser

GXR Twin Turbo · 2023

Offered price

271,500SAR

Your asking price: 285,00013,500 below your ask

Time left

Valid until 21 October 2026 at 17:00

--hours
:
--min
:
--sec

Offer accepted

We will call you to arrange the pick-up and the transfer

Need help? Call us

Car rows in the back office

Thumb, stock number, plate, state; with multi-select

Selected: 1

Toyota Land CruiserGXR Twin Turbo

202338,400 kmPetrolAutomatic

STK-24081289,000 SARListed

Hyundai SonataSmart

202261,200 kmPetrolAutomatic

STK-2391789,500 SARReserved

Lexus ES300h Platinum

202412,800 kmHybridAutomatic

STK-24102219,000 SARListed

Nissan PatrolLE Platinum

202174,500 kmPetrolAutomatic

STK-22764238,000 SARPreparing

Toyota HiluxDouble cab

202345,900 kmDieselManual

STK-23988112,000 SARAwaiting inspection

Toyota CamryGLE Hybrid

202329,300 kmHybridAutomatic

STK-24055118,500 SARSold

GMC YukonDenali

202258,000 kmPetrolAutomatic

STK-23410265,000 SARPublishing blocked

Kia K5GT-Line

20249,800 kmPetrolAutomatic

STK-24127104,900 SARListed

Gallery without photos

No photos yet

08

Tracking and field inspection

Order status on a road, the order ticket, the inspector’s task, inspection points with mandatory photos, and the rating.

Road tracker — order tracking

Press «Next» and the car drives to the next stop

Horizontal — on white

  1. Done: Order placedDeposit held2026-10-12 09:14
  2. Done: PaymentBank transfer2026-10-12 13:40
  3. Current stage: Inspection & prepRiyadh centre2026-10-14 10:05
  4. Upcoming: ShippingCovered carrier
  5. Upcoming: DeliveredAl Malqa

Horizontal — on dark

  1. Done: Order placedDeposit held2026-10-12 09:14
  2. Done: PaymentBank transfer2026-10-12 13:40
  3. Current stage: Inspection & prepRiyadh centre2026-10-14 10:05
  4. Upcoming: ShippingCovered carrier
  5. Upcoming: DeliveredAl Malqa

Vertical — for mobile

  1. Done: Order placedDeposit held2026-10-12 09:14
  2. Done: PaymentBank transfer2026-10-12 13:40
  3. Current stage: Inspection & prepRiyadh centre2026-10-14 10:05
  4. Upcoming: ShippingCovered carrier
  5. Upcoming: DeliveredAl Malqa

Vertical — dark

  1. Done: Order placedDeposit held2026-10-12 09:14
  2. Done: PaymentBank transfer2026-10-12 13:40
  3. Current stage: Inspection & prepRiyadh centre2026-10-14 10:05
  4. Upcoming: ShippingCovered carrier
  5. Upcoming: DeliveredAl Malqa

«Delivery failed» case

The failed stop is red with «!» and the road to it turns red

  1. Done: Order placedDeposit held2026-10-12 09:14
  2. Done: PaymentBank transfer2026-10-12 13:40
  3. Done: Inspection & prepRiyadh centre2026-10-14 10:05
  4. Done: ShippingCovered carrier2026-10-16 08:30
  5. !Failed: Delivery failedCustomer not at address2026-10-17 17:20

Clickable stops

Every stop is a button; the chosen one is ringed

Selected: Shipping

Deal ticket

Fits its space: one column on a phone, body + stub on a wide screen

Deal ticket
Order no.ORD-26-1042

From

HQ

Deliver to

Riyadh · Al Malqa

Car

Toyota Land Cruiser GXR 2024

Pearl white · 18,400 km

Customer

Khalid Alotaibi

Order date

2026-10-12

Deal value

289,500 SAR

Status

On the way

Next step

Shipping — Thursday 16 October

Delivery code

4827

Give it to the courier only on hand-over

ORD-26-1042Scan to verify the order
Deal ticket
Order no.ORD-26-0987

From

HQ

Deliver to

Jeddah · Al Shati

Car

Lexus ES 350 2023

Metallic grey · 32,100 km

Customer

Noura Alqahtani

Order date

2026-10-08

Deal value

187,000 SAR

Status

Delivery failed

Next step

Reschedule delivery with the customer

Delivery code

9031

Give it to the courier only on hand-over

ORD-26-0987Scan to verify the order

Inspector app

Every screen in a 400 px phone frame

Today’s tasks

3 visits · Riyadh, Jeddah, Dammam

On the wayINS-5521
7.4 km· 14 min

Fahad Aldosari

Riyadh · Al Malqa

Address
Anas Bin Malik St, building 14
Car
Nissan Patrol Platinum 2022Black · 61,250 km · BRA 4821
Slot
10:00 – 11:00
Assigned to youINS-5524
12.8 km· 26 min

Sara Alshammari

Jeddah · Al Rawdah

Address
Prince Sultan Rd, gate 3
Car
Hyundai Sonata 2023Silver · 24,900 km
Slot
13:30 – 14:30
Inspection failedINS-5530
3.1 km· 8 min

Majed Almutairi

Dammam · Al Shati

Address
Al Khaleej St, villa 7
Car
Toyota Camry 2021White · 88,300 km
Slot
16:00 – 17:00

Recorded: Registration or ID not available

Inspection form

Nissan Patrol 2022 · INS-5521

Body panels intact

Pass / issue· Scratches, dents, rust

Complete

Paint thickness — front door

Numeric reading

Complete
µm

Accepted range ⁦80–160 µm⁩In range

Windscreen condition

Pick from a list

Front tyre tread depth

Numeric reading

!Flagged
mm

Accepted range ⁦1.6–10 mm⁩Out of the accepted range

Issue photo

Photo attached

Braking performance

Scale 1–5· 1 poor — 5 excellent

Complete
PoorVery goodExcellent

Point states

The four types in their states

No oil leaks

Pass / issue

!Flagged

Issue photo

A photo is required

Start-up smoothness

Scale 1–5

!Flagged
PoorFairExcellent

Windscreen condition

Pick from a list

!Flagged

Paint thickness — front door

Numeric reading

!Flagged
µm

Accepted range ⁦80–160 µm⁩Out of the accepted range

Issue photo

A photo is required

Front tyre tread depth

Numeric reading

mm

Accepted range ⁦1.6–10 mm⁩

Photos

Step 2 of 4

Mandatory photos

5 of 8

Shoot every angle clearly, in good light

3 required photos left

Report review

Chief inspector · Central region

Try a score

Overall score

020406080100
0out of 100

Good

By category

  • Exterior88
  • Interior94
  • Engine & gearbox76
  • Tyres & brakes58
  • Electrics91

Points with issues3

  • !Front tyre tread depthTyres & brakes · 1.2 mm — below the limit
  • !Light oil seepEngine & gearbox · Around the valve cover
  • !Dent on rear fenderExterior · Needs minor bodywork

Chief inspector review

RPT-26-5521

Inspector: Eng. Abdullah Alharbi

B

Finish inspection

Step 4 of 4

Final rating

Pick the grade you give the car after the inspection

Inspection summary

Points checked
42
Issues
3
Photos
9

Star rating

An alternative rating mode

Final rating

Pick the grade you give the car after the inspection

Inspection summary

Points checked
42
Issues
0
Photos
9
09

Tasks, deadlines and notifications

The opportunities board, the task card and its timer, customer time apart from employee time, escalation, and message previews.

Sales opportunities board

Drag cards between stages — mouse, a long press on touch, or the keyboard (Space, then the arrows)

New

22 opportunities

Total410,500SAR

Faisal AlghamdiHot lead

Car of interest: Toyota Land Cruiser GXR 2023

Deal value: 298,000SAR

Last contact
25 minutes ago
Next action
First call within the hour
00:35:00

Hind Alanazi

Car of interest: Hyundai Tucson 2024

Deal value: 112,500SAR

Last contact
52 minutes ago
Next action
Send car photos on WhatsApp
00:08:00

Contacted

22 opportunities

Total283,000SAR

Sultan Alqarni

Car of interest: Lexus ES 350 2022

Deal value: 185,000SAR

Last contact
3 hours ago
Next action
Book a test drive — Al Malqa branch
01:00:00

Lama Alshehri

Car of interest: Mazda CX-5 2023

Deal value: 98,000SAR

Last contact
1 day ago
Next action
Call back after work hours
Escalated02:00:00

Visit / test drive

11 opportunity

Total265,000SAR

Abdulrahman AldosariHot lead

Car of interest: Nissan Patrol Platinum 2022

Deal value: 265,000SAR

Last contact
5 hours ago
Next action
Test drive Thu 4:30 pm — Jeddah, Al Rawdah
47:00:00

Financing

22 opportunities

Total293,900SAR

Nouf Almalki

Car of interest: Hyundai Sonata 2023

Deal value: 104,900SAR

Last contact
2 hours ago
Next action
Awaiting SNB approval
Late00:12:40

Bandar Alshammari

Car of interest: GMC Yukon 2021

Deal value: 189,000SAR

Last contact
9 hours ago
Next action
Collect the salary certificate
22:00:00

Negotiation

11 opportunity

Total121,000SAR

Rima Alharbi

Car of interest: Toyota Camry 2024 — Dammam

Deal value: 121,000SAR

Last contact
40 minutes ago
Next action
Counter-offer: SAR 118,500
00:05:00

Closed — won

22 opportunities

Total641,500SAR

Mohammed Alqahtani

Car of interest: Lexus LX 600 2023

Deal value: 545,000SAR

Last contact
1 day ago
Next action
Hand over the car on Sunday

Ohoud Alzahrani

Car of interest: Kia Sportage 2024

Deal value: 96,500SAR

Last contact
2 days ago
Next action
Issue the invoice

Closed — lost

00 opportunities

Total0SAR

No opportunities at this stage

Drag a card here

Opportunity card

Default, hot, waiting on customer, dragging, won, lost

Default

Sultan Alqarni

Car of interest: Lexus ES 350 2022

Deal value: 185,000SAR

Last contact
3 hours ago
Next action
Book a test drive — Al Malqa branch
01:00:00

Hot, close to its deadline

Hind Alanazi

Car of interest: Hyundai Tucson 2024

Deal value: 112,500SAR

Last contact
52 minutes ago
Next action
Send car photos on WhatsApp
00:08:00

Waiting on customer

Bandar Alshammari

Car of interest: GMC Yukon 2021

Deal value: 189,000SAR

Last contact
9 hours ago
Next action
Collect the salary certificate
22:00:00

Lifted while dragging

Faisal AlghamdiHot lead

Car of interest: Toyota Land Cruiser GXR 2023

Deal value: 298,000SAR

Last contact
25 minutes ago
Next action
First call within the hour
00:35:00

Closed — won

Mohammed Alqahtani

Car of interest: Lexus LX 600 2023

Deal value: 545,000SAR

Last contact
1 day ago
Next action
Hand over the car on Sunday

Closed — lost

Lama Alshehri

Car of interest: Mazda CX-5 2023

Deal value: 98,000SAR

Last contact
1 day ago
Next action
Call back after work hours

Task list

Live counts — «Call the customer to confirm the inspection slot» turns late in a few seconds and moves to «Late»

4 tasks

  • InspectionUrgent00:01:15

    Call the customer to confirm the inspection slot

    Linked record: Inspection request #5108 — Toyota Land Cruiser 2021

    Assignee: Khalid AlotaibiFrom: Inspection booked on the website
  • PurchasingHigh00:50:00

    Price the purchase request and suggest a price

    Linked record: Purchase request #2214 — Lexus ES 2022

    Assignee: Khalid AlotaibiFrom: Technical inspection completed
  • SalesNormal00:40:00Customer time01:40:00

    Follow up the price offer with the customer

    Linked record: Price offer #8812 — Hyundai Sonata 2023

    Assignee: Khalid AlotaibiFrom: Price offer sent by SMS
  • InspectionHighDone01:40:00

    Approve the inspection report

    Linked record: Inspection report #IR-6620 — Mercedes C200 2021

    Assignee: Khalid AlotaibiFrom: Inspector sent the report

Task card in every state

The edge and glow follow the timer state

On track

PurchasingHigh00:50:00

Price the purchase request and suggest a price

Linked record: Purchase request #2214 — Lexus ES 2022

Assignee: Khalid AlotaibiFrom: Technical inspection completed

Almost late

InspectionUrgent00:01:15

Call the customer to confirm the inspection slot

Linked record: Inspection request #5108 — Toyota Land Cruiser 2021

Assignee: Khalid AlotaibiFrom: Inspection booked on the website

Waiting on customer

SalesNormal00:40:00Customer time01:40:00

Follow up the price offer with the customer

Linked record: Price offer #8812 — Hyundai Sonata 2023

Assignee: Khalid AlotaibiFrom: Price offer sent by SMS

Late

SalesHighLate00:12:40

Review the financing documents

Linked record: Sale request #3307 — Nissan Patrol 2022

Assignee: Noura AlqahtaniFrom: Financing path chosen

Escalated

AccountingUrgentEscalated00:45:00Customer time00:20:00

Send the invoice to ZATCA

Linked record: Invoice #INV-10482 — Kia K5 2024

Assignee: Abdullah AlharbiFrom: Payment confirmed

Done

InspectionHighDone01:40:00

Approve the inspection report

Linked record: Inspection report #IR-6620 — Mercedes C200 2021

Assignee: Khalid AlotaibiFrom: Inspector sent the report

Dense task row

Folds its columns on narrow screens

Price the purchase request and suggest a priceHighPurchase request #2214 — Lexus ES 202200:50:00
Call the customer to confirm the inspection slotUrgentInspection request #5108 — Toyota Land Cruiser 202100:01:15
Follow up the price offer with the customerNormalPrice offer #8812 — Hyundai Sonata 202300:40:00Customer time01:40:00
Review the financing documentsHighSale request #3307 — Nissan Patrol 2022Late00:12:40
Send the invoice to ZATCAUrgentInvoice #INV-10482 — Kia K5 2024Escalated00:45:00Customer time00:20:00

Empty list and loading

No tasks, nothing late, and loading

No tasks here

All on time. New tasks appear here the moment a workflow step creates them.

Nothing is late

Well done — your team is within every deadline right now.

Loading

Deadline timer

The employee clock pauses while the task waits on the customer; «Customer time» runs apart

Late+00:12:40Over · of 02:00:00
Employee time
02:12:40
Customer time
00:00:00
Ring — task page
Late

+00:12:40Over

Deadline 09:47

07:47
Employee time
02:12:40/ 02:00:00
Customer time
00:00:00
Bar — task header
Late00:12:40
Chip — cards and rows
  1. Assigned employee

    Khalid Alotaibi

    Purchasing specialist

    Holds it now

    Received 07:47

  2. Direct supervisor

    Eng. Fahad Aldosari

    Purchasing supervisor

    Escalates 10:02 · in 00:02:20

  3. Operations manager

    Turki Alsubaie

    Operations

    Escalates 10:47 · in 00:47:20

Escalation chain

Chips in every state

On track01:28:00Customer time00:08:00
Almost late00:08:00
LateLate00:12:40
EscalatedEscalated00:50:00Customer time00:20:00
Waiting on customer01:05:00Customer time00:35:00
DoneDone late02:10:00Customer time00:20:00

Ring sizes

Almost late00:08:00
Employee time
01:52:00
Customer time
00:00:00
Waiting on customer01:05:00left · of 02:00:00
Employee time
00:55:00
Customer time
00:35:00

Escalation chain states

Who holds the task now and when it escalates

With the employee — on track

  1. Assigned employee

    Khalid Alotaibi

    Purchasing specialist

    Holds it now

    Received 09:20

  2. Direct supervisor

    Eng. Fahad Aldosari

    Purchasing supervisor

    Escalates 11:43 · in 01:43:00

  3. Operations manager

    Turki Alsubaie

    Operations

    Escalates 12:28 · in 02:28:00

Escalated to the supervisor

  1. Assigned employee

    Khalid Alotaibi

    Purchasing specialist

    Received 06:50

  2. Direct supervisor

    Eng. Fahad Aldosari

    Purchasing supervisor

    Holds it now

    Escalated 09:25

  3. Operations manager

    Turki Alsubaie

    Operations

    Escalates 10:10 · in 00:10:00

Escalated to the operations manager

  1. Assigned employee

    Khalid Alotaibi

    Purchasing specialist

    Received 06:40

  2. Direct supervisor

    Eng. Fahad Aldosari

    Purchasing supervisor

    Escalated 08:55

  3. Operations manager

    Turki Alsubaie

    Operations

    Holds it now

    Escalated 09:40

Paused — waiting on customer

  1. Assigned employee

    Khalid Alotaibi

    Purchasing specialist

    Holds it now

    Received 08:30

  2. Direct supervisor

    Eng. Fahad Aldosari

    Purchasing supervisor

    Escalation paused — waiting on customer

  3. Operations manager

    Turki Alsubaie

    Operations

    Escalation paused — waiting on customer

Quick contact log

Pick the channel and outcome, then log — try «Log it» with no outcome to see the error

  1. WhatsAppCustomer replied3 hours ago

    Sent interior photos and the inspection report; asked for a test drive.

    Khalid Alotaibi

  2. CallNo answer1 day ago

    Khalid Alotaibi

App push

10:24

Tuesday, 20 October

10:24

Message previews

As the customer sees them — tap a WhatsApp quick reply, and tap the notifications to see what they open

SMS

Back
Car Platform

Text Message
Today 10:24

Khalid, our offer for your Lexus ES 2022 is ready: SAR 142,000. Valid for 48 hours. View and accept it here: cars.sa/o/8812

Price offer #8812cars.sa

Delivered

Text Message

WhatsApp

Car PlatformBusiness account

Today

Your offer: SAR 142,000

Khalid, we inspected your Lexus ES 2022 and this is our offer to buy it. Valid until Thursday 10:00 am.

Price includes the ownership transfer

10:24Delivered

View report and offer
Message

App push

10:24

Tuesday, 20 October

10:24

Tap a notification to see what it opens

Each channel’s text per event

Three events × three channels, with «When it is sent» under each text

1

Inspection booked

Starts when: The customer confirms an inspection slot on the site or the app

SMS

Back
Car Platform

Text Message
Today 10:24

Dear Khalid, your Toyota Land Cruiser 2021 inspection is confirmed for Wednesday 21 October at 10:30 am — Riyadh, Al Malqa branch. To reschedule: cars.sa/i/5108

Inspection #5108cars.sa

Delivered

Text Message

When it is sent

The moment the booking is confirmed — once

WhatsApp

Car PlatformBusiness account

Today

Inspection confirmed

Hi Khalid Your Toyota Land Cruiser 2021 inspection: Wednesday 21 October · 10:30 am Al Malqa branch — Riyadh It takes about 45 minutes.

Car Platform — 200-point inspection

10:24Delivered

Message

When it is sent

On confirmation, and a reminder 24 hours before

App push

10:24

Tuesday, 20 October

10:24

Tap a notification to see what it opens

When it is sent

On confirmation, and 2 hours before

2

Price offer ready

Starts when: Pricing approved after the inspection

SMS

Back
Car Platform

Text Message
Today 10:24

Khalid, our offer for your Lexus ES 2022 is ready: SAR 142,000. Valid for 48 hours. View and accept it here: cars.sa/o/8812

Price offer #8812cars.sa

Delivered

Text Message

When it is sent

When the price is approved, and 6 hours before it expires

WhatsApp

Car PlatformBusiness account

Today

Your offer: SAR 142,000

Khalid, we inspected your Lexus ES 2022 and this is our offer to buy it. Valid until Thursday 10:00 am.

Price includes the ownership transfer

10:24Delivered

View report and offer
Message

When it is sent

When the price is approved

App push

10:24

Tuesday, 20 October

10:24

Tap a notification to see what it opens

When it is sent

When the price is approved

3

Car on the way

Starts when: The driver starts the delivery trip

SMS

Back
Car Platform

Text Message
Today 10:24

Your Hyundai Sonata 2023 is on its way ETA 4:15 pm. Delivery code: 4821 — give it to the driver only on hand-over. Track: cars.sa/t/DL-771

Track deliverycars.sa

Delivered

Text Message

When it is sent

When the driver sets off

WhatsApp

Car PlatformBusiness account

Today

Your car is on the way

Driver Majed is on the way with your Hyundai Sonata 2023. ETA: 4:15 pm — Al Narjis. Delivery code: 4821

Share the code only at hand-over

10:24Delivered

Track on the map
Message

When it is sent

On departure, then when 10 minutes away

App push

10:24

Tuesday, 20 October

10:24

Tap a notification to see what it opens

When it is sent

On departure, when close, and on arrival

10

Shells

The website, the mobile app and the internal operating system shells, inside device frames.

Internal operating system — AdminShell

Collapse the menu with its edge button, move between modules, open the bell and the user menu, press ⌘K

Today

Good morning, Noura

Today's summary across Riyadh, Jeddah and Dammam.

Synced now18m left

Open purchase requests

128

⁦+12%⁩ vs last week

Inspections today

36

+4 vs last week

Cars listed

412

+28 vs last week

Sales this month

18.5M SAR

⁦+8.4%⁩ vs last week

Cars that need you

Updated two minutes ago

  • Toyota Land Cruiser GXR 2022Al Malqa, Riyadh · 48,200 km289,000 SARInspecting
  • Hyundai Sonata 2021Al Rawdah, Jeddah · 61,000 km74,500 SARListed
  • Lexus ES 350 2023Al Shati, Dammam · 22,500 km198,000 SARReserved
  • Nissan Patrol Platinum 2023Al Narjis, Riyadh · 31,800 km325,000 SARPublishing blocked

SLAs about to breach

Escalate to the supervisor, then the operations manager

  • Approve inspection report — Sonata

    18m left
  • Answer a price offer — Land Cruiser

    34m left
  • Confirm a delivery slot — Patrol

    52m left

Customer website — SiteHeader + HeroBand + SiteFooter

Scroll inside the window: the clear bar turns to glass. Sign in to see the account menu

Car Platform

1,240 inspected cars available now

Your next car,
inspected and guaranteed

Buy with cash or financing, or sell yours at the best price — a full inspection and delivery to your door.

  • 200-point inspection
  • 7-day returns
  • Instant financing approval

Just arrived

Inspected cars listed this week

Listed

Toyota Land Cruiser GXR 2022

Al Malqa, Riyadh · 48,200 km

289,000 SAR

Listed

Hyundai Sonata 2021

Al Rawdah, Jeddah · 61,000 km

74,500 SAR

Listed

Lexus ES 350 2023

Al Shati, Dammam · 22,500 km

198,000 SAR

Listed

Nissan Patrol Platinum 2023

Al Narjis, Riyadh · 31,800 km

325,000 SAR

Customer app and inspector app — MobileAppShell · InspectorAppShell

Switch tabs, scroll to reveal the small title, flip Online / Offline

Home

Hello Khalid

Which car are you looking for today?

Recently viewed

Toyota Land Cruiser GXR

289,000 SAR

Hyundai Sonata

74,500 SAR

Lexus ES 350

198,000 SAR

Nissan Patrol Platinum

325,000 SAR

Land Cruiser purchase

Awaiting inspection — step 2 of 4

Inspecting

Eng. Fahad Aldosari

North Riyadh · Receiving tasks now

Today's tasks

3

Nissan Patrol 2023

Al Malqa, Riyadh

Next
10:304.2 km

Toyota Camry 2022

Al Yasmin, Riyadh

Scheduled
12:007.8 km

Hyundai Tucson 2021

Al Narjis, Riyadh

Scheduled
14:3011.5 km

Clearing agents portal — ClearingAgentShell

An external user: minimal chrome, no prices and no other requests — dark frame

Clearing agents portal

Alharbi clearing office

Transactions assigned to you

Update each transaction and upload its completion documents. Prices never appear in this portal.

  • Toyota Land Cruiser 2022Ownership transfer · TR-20418Assigned
  • Hyundai Sonata 2021Registration renewal · TR-20397On hold
  • Nissan Patrol 2023Lien release · TR-20352Not possible
  • Lexus ES 350Ownership transfer · TR-20311Completed

Page header — PageHeader

Breadcrumbs, title and description, chips, actions, tabs with a gliding line

All purchase requests

Purchasing

Toyota Land Cruiser GXR 2022

Purchase request PR-10482 · from Al Malqa, Riyadh

InspectingPriority

Purchase requests

Individual and dealer requests, with an independent status per car.

Reports

A simple header: a title and a description only.

Device frames — DeviceFrame

A phone with a dynamic island and status bar, a browser window with tabs — light and dark

Car Platform

Plain content inside the phone — it starts under the status bar.

Car Platform

Plain content inside a dark window.

Car Platform